Pasillo de un centro de datos con racks de servidores y equipos de red

Ecotroni Paraguay · Energy · Engineering

Energy efficiency, building automation and e-mobility in Paraguay.

Energy efficiency, home automation, EV chargers, renewable energy, solar thermal hot water systems, automation and controls. Serving Asunción and Central; other departments by project assessment.

Solutions shaped around each project
Foto: Brett Sayles / Pexels

Applications

Solutions for different environments.

Energy and mobility solutions for homes, businesses and infrastructure.

Electric mobility hub

Vehicles, news and charging points in Paraguay

Information for current and future electric and plug-in hybrid vehicle owners, with direct access to the interactive map.

Interactive charger map for Paraguay

Location, connectors, power and reported status where the data source provides them.

Open full map

The ⛔ symbol indicates private or restricted access, not necessarily a fault. “Operational” is the reported status, not real-time availability.

Casa Rica Los Laureles: reading the listing

When checked on 3 October 2026, OCM-307571 distinguished access for staff, visitors or customers from reported operational status. Its last recorded verification was 23 January 2025. Confirm access and operation with the venue before travelling.

View Open Charge Map listing

Latest updates

Electric mobility · Featured

BYD presented the Ti7, an all-wheel-drive plug-in hybrid SUV, in Luque

Ti7 at the 2026 Singapore show; Fangchengbao-badged display car, not the Luque launch.
Reference photo · creditsTi7 at the 2026 Singapore show; Fangchengbao-badged display car, not the Luque launch. Photo: S5A-0043 · Wikimedia Commons · CC BY 4.0

The brand presented the model at Hangar Latitude with DM-p plug-in hybrid technology and all-wheel drive, according to La Nación. The coverage reports a declared combined range of up to 1,015 km, without specifying the test cycle or the electric-only range. As a PHEV, its charging power and connector must be confirmed for the exact version before sizing an installation.

Energy regulation

A proposal would cut tax incentives for electrified vehicles by 50 %

Charging stations in Stuttgart; infrastructure reference photograph, not a Paraguay location.
Reference photo · creditsCharging stations in Stuttgart; infrastructure reference photograph, not a Paraguay location. Photo: Alexander Migl · Wikimedia Commons · CC BY-SA 4.0

According to ADN Digital, the proposal was submitted to the Ministry of Economy and would halve the benefits, phasing in full taxation by 2032. Automotor called for a gradual approach and for battery-electric vehicles to be treated differently from hybrids. The report describes a proposal and industry statements, not a newly enacted law.

Electric mobility

Automotor launched the Geely EX2, a fully electric hatchback

Geely Xingyuan (EX2), photographed in China; reference version.
Reference photo · creditsGeely Xingyuan (EX2), photographed in China; reference version. Photo: Kevauto · Wikimedia Commons · CC BY-SA 4.0

According to ABC Color, the EX2 comes in Pro and Max versions, with a 39.4 kWh LFP battery and an 85 kW motor. The brand declares up to 325 km under the WLTP cycle and 395 km under NEDC; real-world range depends on use and driving conditions. The article does not detail AC or DC charging power, which is needed to choose a home charger.

All sector news

Design · supply · delivery

From equipment to complete systems.

Equipment makes sense when it fits the installation. Each proposal starts with use, loads, site conditions and the required scope.

  • Review of requirements and site conditions
  • Equipment selection for the project
  • Installation and commissioning coordination
About Ecotroni

How we approach projects

Understand first. Size the solution next.

Solutions and proposals are based on the project's actual information.

Share project details
01

Request

We receive the objective, site and service needed.

02

Technical review

We identify the information needed to define the scope.

03

Proposal

We prepare an option with scope and conditions to confirm.

04

Planning

Once accepted, resources, materials and delivery are coordinated.

IHG

Corporate structure

Ecotroni, a company of Iona Holding Group.

A specialized energy and engineering company within Iona Holding Group.

Talk about your project

What does your facility need to solve?

Tell us the goal and we will coordinate the next step.

General enquiries

Tell us about your project

Scan or tap the QR code for WhatsApp. The button prepares an email identifying the service you are interested in.

I want more informationBy email
WhatsApp QR code for General enquiriesWhatsApp · Ecotroni